SITE INTELLIGENCEDIGITAL TWIN COMMAND
Jambo House + Animal KingdomOpen connected 3D campus ↗Enter Virtual Island BETA ↗SITE3 · LOCAL REVIEW
PROJECT COMMAND CENTER

Site Intelligence / Overview

A single spatial record for construction progress, schedules, field evidence and engineering review.

● GO3D Sample ConstructionSynthetic demonstration · metric grid
Latest capture is a dated snapshot, not a live site feed.
CAPTURES02Versioned spatial records
ACTIVITIES06Schedule-linked tasks
OPEN ISSUES00Anchored review notes
LAST CAPTUREOct 16Not live site conditions

Virtual Site

Orbit, inspect and annotate the spatial record

SYNTHETIC CAPTURE0 points
Drag to orbit · Wheel or pinch to zoom · Tap point to inspect
Z ↑
X → Y ↗
Capture history

Spatial Inspector

Selected point and evidence

⌖
Select a point

Click the model to inspect coordinates and attach review notes.

Evidence confidence

What the current record can prove

● Capture metadata DEMO

● Schedule progress UNVERIFIED

● Dimensional accuracy NOT CERTIFIED

Reality Vault

Capture versions, coordinate systems and provenance

Import a capture

Files remain in this browser tab. No upload or persistent hosting.

LAZ and E57 require separate decoding services. Large files are sampled for display. The browser does not generate BIM.

Virtual Site

Remote spatial access, capture history, measurements and review notes.

◎ Orbit and measure

3D projected point selection and sampled distances.

◈ Historical captures

Every snapshot has its own date and coordinate metadata.

⌖ Issue evidence

Anchor notes to selected sample points.

Virtual Site — travel scenario

Explore the potential time and cost of replacing selected nonessential site visits with up-to-date remote review.

Scenario only: includes entered capture and hosting costs but excludes any other operating costs. Does not replace legally required inspections, safety checks or visits where current physical verification is necessary.

Shared customer hosting, panoramas, permissions and live site feeds are planned, not operational in this demo.

4D Command

Schedule dates, predecessor dependencies, and reported versus observed progress. No automatic verification.

Schedule Intelligence

Dependency-aware date scenario and evidence gaps; not a contractual critical path calculation.

No user-selected schedule baseline yet.

4D Timeline

Activity register

Activity details

Choose an activity to inspect its claims and evidence.
Spatial observations

Observations must be manually entered with a capture reference. They are not certified measurements or automatically verified construction progress.

Progress percentages are imported or entered claims. They are not automatically verified by the point cloud. No Procore integration is connected.

Spatial Audit

Compare preview-sampled occupied cells only when the coordinate reference matches.

Select two captures to compare.

Issue register

Export includes capture provenance, activity claims, issue notes and limitations.

Dragonfire Processing

Future processing engine for scan registration, optimization, change analysis and CAD preparation.

ϟ GO3D-owned MSI

Remote CPU/GPU jobs using approved software and access controls.

☁ Cloud VM overflow

Optional elastic processing for suitable approved data.

↔ Evidence handoff

Versioned outputs, reproducible parameters, metered runtime.

No worker, remote transfer, billing, shared storage or GPU processing is connected in this release. Do not submit sensitive information.

Explain

Anchor review issue